Inquiry
Form loading...
Vacuum Cleaning Furnace for Chemical Fiber Industry - Top China Suppliers & Factory Solutions
Hot Products

Vacuum Cleaning Furnace for Chemical Fiber Industry - Top China Suppliers & Factory Solutions

,

A vacuum cleaning furnace, also referred to as a vacuum calcination furnace, is specialized equipment designed for effective cleaning of components in industries such as chemical fibers and plastics. By creating a vacuum environment that isolates air, the furnace enables high molecular weight polymers on the surfaces of cleaned items to crack and oxidize under high-temperature conditions. This innovative cleaning process ensures thorough removal of contaminants.

,

The vacuum cleaning furnace typically comprises a vacuum-sealed chamber, stainless steel electric heating tubes, a waste collection tank, a water spray washer, a water ring vacuum pump, a work-piece basket, and an advanced automatic temperature control system, alongside an automated vacuum pump start-stop mechanism and various instruments.

,

Our vacuum cleaning furnaces come in different structural forms, including vertical, horizontal, well type, and rectangular designs. As a leading manufacturer and supplier in China, Futai Machinery Co., Ltd. offers a range of specifications and models tailored to meet the unique cleaning needs of our customers. Whether you require cleaning solutions for filter elements, spinnerets, or spinning components, our factory is equipped to design and deliver the ideal cleaning plan for your specific applications.

,

    Product Introduction

    Vacuum Cleaning Furnace is designed for cleaning spin pack body, spinneret, and candle filter, spinning meter pump, other spinning components, especially suitable for profiled, fine denier spinnerets in synthetic fiber production industry, such as PET, PA, PP as well mould in plastic extrusion field.

    Vacuum Cleaning Furnace 2Vacuum Cleaning Furnace 3

    Principle

    The principle of vacuum cleaning furnace is based on the property that high molecule of synthetic fiber, isolated from air, is to be molten when the temperature reaches up to 300℃, then melt polymers flow into waste collecting tank; when the temperature increases to 350℃, up to 500℃, polymer starts to degrade and exhaust out of furnace.

    Example of Cleaning Process Setting

    Cleaning process and its program setting depends on the character of spinnerets, candle filters and work pieces to be cleaned, property of polymers as well.

    Hereafter it is the example of cleaning work pieces used on polyester staple fiber spinning systems.

    • 1 OA Phase: In 0–50 minutes, heating work pieces up to temperature 350℃.
    • 2 AB Phase: Keeping temperature at 350℃ of inner furnace for about 50–150 minutes. During this period more than 80% molecular polymer on the work-piece are molten and flow into waste collecting tank. This phase can be increased or decreased according to the quantity of molecular polymer to be cleaned.
    • 3 After AB phase, switching on solenoid valve and vacuum pump.
    • 4 BC/CD/DE/EF Phase: At the temperature of about 490–500℃ in about 150–480 minutes, under the conditions of vacuum, high temperature and low oxygen, the residuals of molecular polymers are fully oxidative degraded. The work pieces to be thoroughly cleaned or not takes place during this key period.
    • 5 After EF Phase (Cooling Period): The power for heating elements and water supply are stopped; only instruments are powered on.
    Chemical Reaction: CmHn + O2 = CO2↑ + H2O↑

    At the same time, by rinsing and pump, Carbon, vapor and substances are discharged out of furnace.

    Example of cleaning process setting

    Maximum temperature is set at 490℃, running time 8 hours; after 90 minutes heating, vacuum pump starts.

    In order to improve the cleaning effect and increase the life time of work pieces, after taking out of vacuum cleaning furnace, the subsequent process should be carried out, but depending on specific conditions.

    • 1 Put spinnerets, candle filters or other elements into hot water tank to rinse for about 20 minutes.
    • 2 Then carry these work pieces into ultrasonic cleaning unit for about 30 minutes, ultrasonic frequency 25~40 kHz.
    • 3 After rinsing inside ultrasonic cleaning unit, dry it by compressed air before examination under microscope.
    • 4 In case of silicone oil adhering to the surface of work pieces, before ultrasonic treatment, put it inside KOH solution at concentration 20%, temperature 60~70℃ for about 2 hours, then neutralization treatment with oxalic acid.

    Hereafter some dimension is listed. We provide any dimension as requested.

    Model

    Hearth Dimension (L×W×H)

    Heating / Vacuum Pump (KW)

    Vacuum Level (MPa)

    Designing Temperature (℃)

    Precision (±℃)

    LZKL Furnace

    LZKL-A

    φ500×600

    18/2.2

    -0.07~-0.085

    600

    2

    LZKL-B

    φ600×800

    21/2.2

    -0.07~-0.085

    600

    2

    LZKL-C

    φ800×1000

    30/4

    -0.07~-0.085

    600

    2

    LZKL-D

    φ1000×1200

    36/4

    -0.07~-0.085

    600

    2

    WZKL Furnace

    WZKL-A

    φ500×600

    18/2.2

    -0.07~-0.085

    600

    2

    WZKL-B

    φ600×900

    21/2.2

    -0.07~-0.085

    600

    2

    WZKL-C

    φ800×1000

    30/4

    -0.07~-0.085

    600

    2

    WZKL-D

    φ1000×1500

    36/4

    -0.07~-0.085

    600

    2

    WZKL-E

    φ1700×4800

    234/18.5

    -0.07~-0.085

    600

    2

    JZKL Furnace

    JZKL-A

    600×400×400

    18/2.2

    -0.07~-0.085

    600

    2

    JZKL-B

    600×400×400

    21/2.2

    -0.07~-0.085

    600

    2

    JZKL-C

    1000×800×600

    30/4

    -0.07~-0.085

    600

    2

    JZKL-D

    1200×800×800

    36/4

    -0.07~-0.085

    0.45

    2

    Product Features

    ⚡ Low Heating Power & High Thermal Efficiency
    🌡️ Fast Heating Rate & Good Temperature Uniformity
    ✅ Good Cleaning Effect
    💰 Low Operating Costs
    🌿 Good Environmental Performance
    🛡️ Safe and Reliable

    Application Field

    It applies for cleaning key components such as spinnerets, candle filters, and spinning pack body in the chemical fiber industry; Also it can be used for the plastic industry such as for cleaning molds, granulators, mesh sheets, and film unit molds.

    Frequently Asked Questions

    ❓ What types of components can be cleaned in a Vacuum Cleaning Furnace?
    The Vacuum Cleaning Furnace is designed to clean spin pack bodies, spinnerets, candle filters, spinning meter pumps, and other spinning components. It is also suitable for cleaning molds, granulators, mesh sheets, and film unit molds in the plastic industry.
    ❓ What is the working principle of the Vacuum Cleaning Furnace?
    The furnace works by heating components in a vacuum environment. At around 300℃, high-molecular polymers melt and flow into a waste collecting tank. As the temperature rises to 350℃–500℃, the remaining polymers degrade and are exhausted out of the furnace through vacuum pumping, achieving thorough cleaning.
    ❓ How long does a typical cleaning cycle take?
    A typical cleaning cycle takes approximately 8 hours. This includes a heating phase (0–50 min to reach 350℃), a melting phase (50–150 min at 350℃), a high-temperature vacuum degradation phase (150–480 min at 490–500℃), and a final cooling period.
    ❓ Are there any recommended post-cleaning treatments after using the furnace?
    Yes. After removing components from the furnace, it is recommended to rinse them in a hot water tank for ~20 minutes, followed by ultrasonic cleaning at 25–40 kHz for ~30 minutes, then dry with compressed air before microscopic inspection. For components with silicone oil residue, pre-treatment with 20% KOH solution at 60–70℃ for 2 hours and neutralization with oxalic acid is advised.
    ❓ What models and sizes are available for the Vacuum Cleaning Furnace?
    Three furnace series are available: LZKL (cylindrical, 4 sizes from φ500×600 to φ1000×1200), WZKL (cylindrical, 5 sizes from φ500×600 to φ1700×4800), and JZKL (rectangular, 4 sizes from 600×400×400 to 1200×800×800). Custom dimensions are also available upon request.
    ❓ What is the maximum operating temperature and vacuum level of the furnace?
    The furnace has a designing temperature of up to 600℃ with a temperature precision of ±2℃. The vacuum level reaches -0.07 to -0.085 MPa, ensuring effective low-oxygen degradation of polymer residues during the cleaning process.